Sign in to view more content

Create your free account or sign in to continue your search

Welcome back

By clicking Continue to join or sign in, you agree to LinkedIn’s User Agreement, Privacy Policy, and Cookie Policy.

New to LinkedIn? Join now

or

New to LinkedIn? Join now

By clicking Continue to join or sign in, you agree to LinkedIn’s User Agreement, Privacy Policy, and Cookie Policy.

Skip to main content
LinkedIn
  • Top Content
  • People
  • Learning
  • Jobs
  • Games
Join now Sign in
  1. All
  2. Industrial Control

Struggling to optimize precision and efficiency in your control engineering projects?

In the intricate dance of control engineering, precision and efficiency are partners. To elevate your project's performance, consider these strategies:

- Implement robust testing protocols to catch errors early. Early detection saves time and resources.

- Optimize algorithms for speed without compromising on accuracy. Balance is key in control engineering.

- Utilize simulation tools to predict outcomes and refine processes before implementation.

How do you enhance precision and efficiency in your projects? Share your strategies.

Control Engineering Control Engineering

Control Engineering

+ Follow
  1. All
  2. Industrial Control

Struggling to optimize precision and efficiency in your control engineering projects?

In the intricate dance of control engineering, precision and efficiency are partners. To elevate your project's performance, consider these strategies:

- Implement robust testing protocols to catch errors early. Early detection saves time and resources.

- Optimize algorithms for speed without compromising on accuracy. Balance is key in control engineering.

- Utilize simulation tools to predict outcomes and refine processes before implementation.

How do you enhance precision and efficiency in your projects? Share your strategies.

Add your perspective
Help others by sharing more (125 characters min.)
6 answers
  • Contributor profile photo
    Contributor profile photo
    Jörg Rottkord

    Global Industry Manager Automotive at Beckhoff Automation GmbH & Co. KG

    • Report contribution

    The way to a successful application starts with the right selection of the underlying realtime Fieldbus protocol that transmits the closed-loop actuator/sensor datasets to the servo drive for instance. If the cyclic parameter updates which get cyclically sent to the actuators, and the current values (the feedback that comes back from the position displacement encoders or force feedback sensors), are not distributed and collected hard deterministically, it would results in poor control quality. Also, systems need to be capable of adaptions. Process layouts change, and with that the number of needed actuator / feedback combinations in the system, changing also the bandwidth utilization. EtherCAT, invented by Beckhoff in 2003, is the answer!

    Like
    8
  • Contributor profile photo
    Contributor profile photo
    Virupakshappa Hovale

    Regional Director I Strategy & Execution, CEO Enabler, Growth Driver |Reinvention, Innovation, Design Thinking| Partner Management | CMO I Collaborative Robots I Automation, IoT | Coaching | Author - UNBOXING CREATIVITY

    • Report contribution

    One thing most important to start is identifying the need of specified precision levels; Not every control system needs to be of highest precision at highest efficiency. The control engineer needs to collaborate strongly with process experts in balancing two ends of Precision and Efficiency: and finally Design is closely associated with iterations and prototyping 😊

    Like
    7
  • Contributor profile photo
    Contributor profile photo
    Lawrence Hamilton

    Semi-retired

    • Report contribution

    Start with what outcome you want or expect and work back. The level of precision and control will depend on outcome expectations. Do it once, do it right.

    Like
    3
  • Contributor profile photo
    Contributor profile photo
    Amit Singh

    SME Control Systems & Instrumentation Engineering I Functionally Safe & Cyber Secured Critical OT Infra Engineering Specialist I IEC 61511 FSE Certified TUV Rheinland I ISA99/IEC 62443 Certified Cybersecurity Expert

    • Report contribution

    Based on multiple projects lifecycle experience in past, following are few key considerations to enhance precision and efficiency in industrial control system projects: - Timely calibration and response checks of all respective field instruments (sensors, initiators, final elements) after delivery at site prior to commissioning - Comprehensive ITPs checks for installation/leak test of instrument hook-ups/tubing/joints - Thorough Instrument Loop checks for convention loops - In case of Digital/Foundation Fieldbus protocols comprehensive checks of foundation fieldbus parameters including grounding/shielding etc, followed by Fieldbus handheld tools - Validation of all SIFs on site(pipe to pipe approach) - System (BPCS/SIS) h/w functionality

    Like
    2
  • Contributor profile photo
    Contributor profile photo
    Dener Fonseca

    Desenvolvedor Full Stack | JavaScript | TypeScript | React.js | Node.js | Express.js | Java | Python | SQL | Estudante de Engenharia de Software | Técnico em Mecânica

    • Report contribution

    To enhance precision and efficiency in control engineering projects, I focus on several key strategies. First, I implement robust testing protocols to detect errors early, which saves time and resources. This proactive approach allows for adjustments before full implementation. Next, I optimize algorithms to improve speed while maintaining accuracy, as finding the right balance is essential. Additionally, I utilize simulation tools to predict outcomes and refine processes, helping to ensure that designs are effective before deployment. By combining these methods, I strive to elevate project performance and achieve the desired results efficiently.

    Like
    1
View more answers
Control Engineering Control Engineering

Control Engineering

+ Follow

Rate this article

We created this article with the help of AI. What do you think of it?
It’s great It’s not so great

Thanks for your feedback

Your feedback is private. Like or react to bring the conversation to your network.

Tell us more

Report this article

More articles on Control Engineering

No more previous content
  • Facing a breach in your control system's cybersecurity measures. How will you safeguard your architecture?

  • How would you address client concerns about the impact of new control strategies on their operations?

  • Control engineering timelines clash with software schedules. How do you manage expectations?

  • You're facing delays in integrating control systems. How can you manage client expectations effectively?

  • You're striving for short-term performance. How can you ensure long-term control system optimization?

  • Stakeholders are pushing for deadline-driven results. How do you emphasize the importance of quality control?

  • You're rapidly prototyping control systems. How do you maintain safety standards?

  • You're leading a control system design team. How can you prioritize safety without sacrificing efficiency?

  • You're torn between control engineers and finance teams. How do you decide where to allocate resources?

No more next content
See all

More relevant reading

  • Failure Analysis
    How do you design and conduct a creep test to obtain reliable and accurate data?
  • Electronic Engineering
    How do you calibrate and maintain pressure sensors in harsh environments?
  • Mechanics
    How do you model fluid flow in a pipe network?
  • Aerospace Engineering
    How do you present safety and reliability analysis to stakeholders?

Are you sure you want to delete your contribution?

Are you sure you want to delete your reply?

  • LinkedIn © 2025
  • About
  • Accessibility
  • User Agreement
  • Privacy Policy
  • Your California Privacy Choices
  • Cookie Policy
  • Copyright Policy
  • Brand Policy
  • Guest Controls
  • Community Guidelines
Like
1
6 Contributions